Engineering of the entire steel structure

The entire steel structure was planned by the engineers at SSI SCHAEFER, with the various subcontractors - from the construction company to the air conditioning and refrigeration supplier to the roof and wall supplier - being coordinated in advance. In addition to the construction of the steel structure, the external weather conditions at different building heights also had to be taken into account and the steel structures had to be able to support the wall and the roof with the solar collectors.