The solution

MPE opted for a combined system solution by SSI SCHAEFER, consisting of mobile racks and automated guided vehicles. The installation of the mobile racking system with 5,100 pallet spaces within the structural conditions as well as the implementation of the AGVs required a seven-month construction period.

Both buildings are connected by a bridge at a height of six meters. Pallets with goods from production are transferred to a conveyor belt, lifted vertically to the second level and fed into the mobile racking system. 

AGVs carry out the storage of pallets as well as the retrieval of required load carriers, their transport and provision to the shipping area.